Future & Completed Projects

  • Lakeland Community College/University Center, Kirtland, OH
  • Micropoise, Streetsboro, OH
  • Margaret Wagner Home, Cleveland Hts., OH
  • Nestle USA, Solon, OH
  • Orange Community Education and Recreation Center, Orange, OH
  • Vista Germantown, Nashville, TN – HVAC replacement
  • PNC Cincinnati/Cleveland – chiller replacement
  • Gospel Press: 100 suite apartment building conversion, $725,000.00, Cleveland, OH
  • Infinity #2: 4 story office building, approximately 140,000 square feet; 400 tons VAV. Cleveland, OH. Design/Build, $850,000.00
  • Book Cadillac Hotel and Condominium: 31 story design/build rehab in Detroit, MI – 850,000 square feet, $10 million dollar project. Water source heat pump, 600+ units.
  • Marymount Convalescent Home, Garfield Hts., OH: VRF System.
  • 4600 Euclid, Cleveland, OH: office building and parking garage, VAV system.
  • Park Building, Cleveland, OH: condominiums and office building
  • Baldwin Wallace College, Berea, OH: Geothermal design/build. Water source heat pump.
  • Gwinn Estate, Bratenahl, OH: Geothermal, water source heat pump.
  • Airport Marriott Hotel, Cleveland, OH: Water source heat pump
  • DDR – Developers Diversified Realty, Beachwood, OH: 130,000 square foot VAV office building with 300,000 square foot heated parking garage.
  • Westrich Residence, Solon, OH: Indoor pool, combination HVAC and pool heating.
  • Andrew Jackson Hall, University of Akron, OH: VRF system.
  • Marriott Tower Hotel, Cleveland, OH: water source heat pump. 400+ units.
  • Beachcliff Shopping Center – replacement of central HVAC system – design/build project: $450,000.00
  • Historic Newton Building – downtown Cleveland
  • Wellpointe Pavilion (Parma Hospital) medical facility – Broadview Heights
  • 1220 Euclid Building – 8 story rehab using steam and chilled water
  • W.T. Grant: 74 apartment suites and garage conversion.
  • PDC Office Building: install two new 100 ton VAV rooftop units, design/build project.
  • Homeland Security Office (Duke Building): install HVAC, required CIA security clearance, design/build: $175,000.00.
  • Hilton Hotel: new heating and A/C system. Installed 450 new units; completed job while building was occupied, $2.5 million dollar design/build project. Water source heat pump.
  • Eton Collection: retail finish, Woodmere, OH.
  • Vista Way Shopping Center: Design/Build, $200,000.00
  • Avery Dennison: 250,000 square foot office and new factory; $3.5 million dollar design/build project, Concord, OH.
  • 3700 Park East Building, Beachwood, OH: new boilers
  • BW3 Restaurant, Bainbridge, OH
  • Cleveland Cord Blood Center, Warrensville Hts., OH
  • Avalon Station: Shaker Heights, OH
  • Bridgeview Crossings Shopping Center: Design/Build, $450,000.00.
  • Winking Lizard Tavern – All locations
  • Fairview Phase I, Marion, OH: Boilers
  • Pinewood Gardens, Dayton, OH
  • Jani-King, Broadview Hts., OH: new facility
  • Wyandot Square, Galion, OH
  • Norwalk North Apartments, Norwalk, OH
  • Welshfield Inn, Welshfield, OH
  • Fountain Apartments, Connersville, IN – 102 suites with boilers and PTAC units
  • Walnut Hills, Cincinnati, OH – 224 PTAC’s with duct kits.
  • Westview Apartments – Youngstown, OH – 124 gas furnaces with remote condensing units.